

Sports Equipment Manufacturer
Dismountable sports wood flooring
For venues that need a floor planned around panel handling, installation and future movement, consider LDK25W05 and LDK25W03. W05 focuses on modular connections for training and competition venues; W03 is positioned for event, competition and rental operations where transport, storage and repeat installation matter.
Recommended dismountable systems
W05 · Modular panel connections
W05 is suited to training and competition venues that need a modular floor layout. Its structure includes a 30 mm LVL main joist, 12 mm composite board, 20 mm resilient pads and interlocking module connections.
Plan the module layout, connection details, assembly sequence and storage needs with the project team.
W03 · Event and rental use
W03 is suited to competition organizers, temporary venues and floor-rental operators. Its dismountable format supports planning for transport, storage and repeat installation around event schedules. Transport, storage, and repeat installation are central to this format; the portable basketball wood floorportable basketball wood floor guide covers that event planning angle.
Include the venue access route, event calendar, handling workflow and storage location in the deployment plan.
Two distinct operating plans
Review W05 for training and competition venues that need interlocking panels. Plan around module layout, connections, assembly, handling and storage.
Review W03 for competition, temporary venue and rental plans. Put transport, storage, event schedules and repeated installation at the center of the brief.
Both systems need project-specific planning for the venue and operating model. Compare their specifications on the sports flooring systems comparison.
Dismountable flooring questions For a dismountable floor, review the sports flooring supplier questionssports flooring supplier questions before planning how the system will be handled.
Yes. W03 is positioned for event and rental operations, while W05 is positioned for modular training and competition venues. Their project planning priorities differ.
W03 is the event and rental-focused option. Plan for event schedules, venue access, transport, storage and repeat installation.
Consider W05 when the training or competition project needs a modular panel layout and interlocking connections. Plan the module arrangement and handling workflow with the venue team.
Share the sports programme, venue dimensions, event or training calendar, access route, installation schedule and available storage area so the system can be matched to the operating plan.
Tell us whether your project is centered on modular training and competition, or event and rental operations. We can help you compare W05 and W03 for the brief.