

Sports Equipment Manufacturer
Four systems, one focus
Every LDK floor is supplied as a complete system – playing surface, load-bearing layers, joists and resilient pads – not as loose hardwood boards. Surfaces are available in North American maple or Russian birch.
Permanent · Single joistA 70 mm permanent floor for new school gyms, community sports centres and regular basketball training. 22 mm maple or birch surface, 12 mm laminated plywood load panel, 24 mm LVL joists and 12 mm resilient pads over a PE moisture barrier.
Explore LDK25W01 →
Permanent · Double joistA 114 mm permanent floor for university gyms, larger school halls and multi-sport venues. 22 mm maple or birch surface on double-layer 30 × 50 mm solid pine battens laid in a grid, with 12 mm resilient pads and a PE moisture barrier.
Explore LDK25W02 →
Modular · Training & competitionAn 84 mm modular system built to FIBA standards, with interlocking modules and metal pull-tab connectors for venues that assemble and remove the court. 22 mm maple or birch surface, 12 mm composite middle layer, 30 mm LVL main joists and 20 mm resilient pads.
Explore LDK25W05 →
Dismountable · Events & rentalAn 88 mm dismountable system built to FIBA standards, with a high-grade maple surface for competitions, temporary arenas and floor-rental operators. Built from solid wood composite panels, load panels, keelson plates, steel latches and resilient rubber mats.
Explore LDK25W03 →Not sure which one? See the side-by-side comparison of all four systems →
Start with how the venue operates
| Permanent floors | Dismountable floors | |
|---|---|---|
| Systems | LDK25W01 · LDK25W02 | LDK25W05 · LDK25W03 |
| Best for | Courts used as a sports floor every day | Courts that are assembled, removed, moved or rented |
| Typical venues | School gyms, university halls, community centres, training facilities | Competition arenas, temporary venues, event organisers, rental fleets |
| Plan around | Concrete slab, floor height, moisture control, court markings | Panel handling, assembly crew, transport, storage space |
| Explore | View permanent systems → | View dismountable systems → |
What is inside the floor
Shock absorption, ball bounce and long-term stability come from the layers you never see. A typical LDK permanent floor is built up from the slab like this:

Applications
Durable permanent courts for PE classes, basketball and volleyball.
School gym flooring →Larger halls with long daily schedules across several sports.
Multi-sport hall flooring →Consistent bounce and shock absorption for repeated daily training.
Compare systems →Floors that are laid for a tournament and removed afterwards.
Competition & event flooring →Panel systems built for transport, storage and repeat installation.
View W03 →Tell us the court size and slab condition, and we will match a system to the existing hall.
Send your court details →Plan the whole gym
A sports wood floor is a major investment for a club, school or university, so plan the hall to work hard. One full-size basketball court can be divided into three cross-courts for training by adding side-mounted hoops and a divider curtain – two full courts give you six training courts.
For these venues we recommend ceiling-suspended basketball systems, which fold away to clear the floor, with in-ground systems as the alternative. LDK also supplies the lighting and sound for the same project.
Projects
A competition court built to international standards that hosts international basketball tournaments.
Hawaii, USA · Indoor gymA sports wood floor paired with height-adjustable, ceiling-suspended basketball systems.
An indoor basketball court supplied with an LDK sports wood floor.
Certificates & documents
Review the documents behind our floors before you specify them.
How we work
FAQ
Permanent systems (LDK25W01, LDK25W02) are installed once over a prepared slab and stay in place as the venue’s everyday court. Dismountable systems (LDK25W05, LDK25W03) are built from panels that can be assembled, removed, stored and reinstalled for competitions, events or rental.
The 22 mm surface of W01, W02 and W05 is available in North American maple or Russian birch. W03 uses a high-grade maple surface.
One court. Projects are quoted per court area, for example a 32 × 19 m (608 m²) basketball hall.
Typically 35–65 days after order confirmation, depending on the system and project size.
We supply the complete floor system with a free layout design, site entry requirements and multilingual remote installation guidance. In many regions, installation can also be arranged through our partner installation teams.
Cost depends on the system, wood species, court area, subfloor condition and shipping destination. Send us your court size and country for a project quotation.
Tell us the sport, court size and country. We will recommend a system and send a project quotation.
Email [email protected] · WhatsApp +86 152 1950 4797